Department Material Forms (DMFs)
DMF # DMF Title Section Description of Use
6 Concrete Mix Design Ready-Mix and Precast Concrete Completed by producers and submitted to the Department for evaluation
7A PCC Plant Quality Control of Fine Aggregate Stockpile Ready-Mix Concrete Completed by the PCC plant for on-site fine aggregate stockpiles
7B PCC Plant Quality Control of Coarse Aggregate Stockpile Ready-Mix Concrete Completed by the PCC plant for on-site coarse aggregate stockpiles
7C Plant Aggregate Stockpile Moisture and Adjusted Water Calculation Ready-Mix Concrete Completed by the PCC plant for stockpiles to be used in PCC production
7D Plant Air and Slump History Ready-Mix Concrete Summary of minimum PCC production testing to be completed by the PCC plant
7E Plant Daily Production Log Ready-Mix Concrete Completed by the PCC plant to record daily production
200 Quality Assurance Audit Form for Sign Fabricators Traffic Used by DelDOT to perform sign fabricator quality audits
210 Emulsified Asphalt Tack Coat Supplier Tank Refill Log Chemical Lab Completed by an emulsified asphalt tack coat supplier whenever the supplier’s tank is refilled