Department Material Forms (DMFs)
Appearance
| Department Material Forms (DMFs) | |||
|---|---|---|---|
| DMF # | DMF Title | Section | Description of Use |
| 6 | Concrete Mix Design | Ready-Mix and Precast Concrete | Completed by producers and submitted to the Department for evaluation |
| 7A | PCC Plant Quality Control of Fine Aggregate Stockpile | Ready-Mix Concrete | Completed by the PCC plant for on-site fine aggregate stockpiles |
| 7B | PCC Plant Quality Control of Coarse Aggregate Stockpile | Ready-Mix Concrete | Completed by the PCC plant for on-site coarse aggregate stockpiles |
| 7C | Plant Aggregate Stockpile Moisture and Adjusted Water Calculation | Ready-Mix Concrete | Completed by the PCC plant for stockpiles to be used in PCC production |
| 7D | Plant Air and Slump History | Ready-Mix Concrete | Summary of minimum PCC production testing to be completed by the PCC plant |
| 7E | Plant Daily Production Log | Ready-Mix Concrete | Completed by the PCC plant to record daily production |
| 200 | Quality Assurance Audit Form for Sign Fabricators | Traffic | Used by DelDOT to perform sign fabricator quality audits |
| 210 | Emulsified Asphalt Tack Coat Supplier Tank Refill Log | Chemical Lab | Completed by an emulsified asphalt tack coat supplier whenever the supplier’s tank is refilled |